Toyota 4 Runner/Hilux/Surf

1987-1998 of release

Repair and operation of the car



Toyota 4ranner
+ 1. Maintenance instruction
+ 2. Maintenance
+ 3. Engines
+ 4. Systems of heating, ventilation
+ 5. Fuel and exhaust systems
+ 6. Transmissions
- 7. Transmission elements
   7.1. Specifications
   + 7.2. Coupling
   + 7.3. Cardan shaft and cardan hinges
   7.4. Back and forward axes
   7.5. Bearing, epiploon and half shaft of the back bridge
   7.6. Epiploon of a reducer of the back bridge and forward axis
   7.7. Zadny Bridge
   7.8. Forward half shafts
   7.9. Replacement of covers and dismantling of the CV JOINT
   + 7.10. Electromagnetic drive of a forward leading axis (ADD system)
   7.11. Forward reducer
+ 8. Brake system
+ 9. Suspension bracket and steering
+ 10. Body
+ 11. Electric equipment
+ 12. Electroschemes





7.8. Forward half shafts

GENERAL INFORMATION

Half shaft details

1. Mud-reflector
2. Tulip CV JOINT
3, 10. Lock ring
4. Cover of the internal CV JOINT
5. Collars
6. Cover of the external CV JOINT
8. Crosspiece of the CV JOINT (Tripod)
9. The external CV JOINT with a half shaft

Removal and installation

PERFORMANCE ORDER
1. Lift the car and remove wheels.
2. Merge oil from a forward reducer.
3. Rasshplintuyte also turn off a nave nut (ask the assistant to press on
brake).
4. Weaken a half shaft in a rotary fist a brass mandrel (not steel).
5. Disconnect a bipod from a fist.
6. Twist a fist outside, having turned a wheel, and get a half shaft at first from a fist, then from a reducer. If necessary displace a half shaft in blows of a rubber hammer.
7. Installation is carried out upside-down.