Toyota 4 Runner/Hilux/Surf

1987-1998 of release

Repair and operation of the car



Toyota 4ranner
+ 1. Maintenance instruction
+ 2. Maintenance
- 3. Engines
   + 3.1. 4-cylinder engines
   + 3.2. V6 3,0 engines of l (1993-1994) and 3,4 l (since 1995)
   - 3.3. Dismantle and capital repairs of the engine
      3.3.1. Specifications
      + 3.3.2. Capital repairs
      3.3.3. Diagnostics of the engine by means of the vacuum gage
      3.3.4. Check of a compression in engine cylinders
      + 3.3.5. Dismantle of the power unit
      + 3.3.6. Head of cylinders
      3.3.7. Valves
      3.3.8. Shatunno-porshnevaya group
      + 3.3.9. Crankshaft
      3.3.10. Block of cylinders
      3.3.11. Honningovaniye of cylinders
      + 3.3.12. Rods and pistons
      3.3.13. Radical and shatunny bearings
      3.3.14. Balansirny shaft
      3.3.15. Assembly order
      3.3.16. Piston rings
      3.3.17. Start-up of the engine after repair and a running in
+ 4. Systems of heating, ventilation
+ 5. Fuel and exhaust systems
+ 6. Transmissions
+ 7. Transmission elements
+ 8. Brake system
+ 9. Suspension bracket and steering
+ 10. Body
+ 11. Electric equipment
+ 12. Electroschemes





3.3.14. Balansirny shaft

GENERAL INFORMATION

Balansirny shaft (on engines of 2,7 l) are established on both parties of the block of cylinders and have the drive from a separate chain (see rice. Details of forward part of the engine).

Removal
PERFORMANCE ORDER
1. Remove a natyazhitel of a chain of N1, directing, an asterisk of N1 and a chain of a cam-shaft.
2. Record a plunger of a natyazhitel of a chain of a balansirny shaft by means of the probe (1).
3. Turn off a bolt and remove an uspokoitel of N2.
4. Turn off bolts (are specified by shooters) and remove an uspokoitel of N3.
5. Turn off a nut (it is specified by an arrow) and remove a natyazhitel of a chain.
6. Turn off a bolt and remove the leading gear wheel of the top shaft and a chain.
7. Turn off bolts (are specified by shooters) and remove an uspokoitel of N4.

Check

PERFORMANCE ORDER
Chain and gear wheels
1. The chain and gear wheels change in a set. The gear wheel is pressed from a shaft. Clear details.
2. Check a condition of details. At detection of wear tracks replace.
3. The chain should be changed after run or at noticeable damages, and also in the presence of a side play of links.
Balansirny shaft
4. Check an axial side play of a shaft, having displaced it back and having put forward.
5. Get both shaft.
6. Carefully check a condition of shaft (if necessary address to car service).

Installation


Prevention

Before installation of balansirny shaft it is necessary to install the crankshaft, pistons with rods and to expose the piston of the 1st cylinder in compression step VMT so that counterbalances of balansirny shaft were below.


PERFORMANCE ORDER
1. Establish shaft and tighten bolts of covers.
2. Establish an uspokoitel.
3. Establish a balansirny chain, having combined tags (2) on an asterisk of the crankshaft (1) and on a gear wheel of a balansirny shaft (3) with distinctive links of a chain. One more distinctive link arrange opposite to a big adjusting tag of the leading gear wheel of a balansirny shaft. Insert the roller of the leading gear wheel into an opening in a persistent plate of a balansirny shaft. Combine small tags of the leading gear wheel with tags on a gear wheel of a balansirny shaft.
4. Tighten a bolt of the leading gear wheel with the set moment.
5. Establish an uspokoitel of N3, then an uspokoitel of N2, having tightened bolts. Get the probe from a plunger.